Natural Resource Management

DSSAT 3. Vol. 1, 2 and 3

Coming soon

  • Date of Publication: 1994
  • Author(s): G.Y. Tsuji; G. Uehara; S. Balas
  • Type of Document: Research Report

CRSP:

Database:

The Priming Program of SANREM CRSP/Philippines

The Priming Program of SANREM CRSP was meant to use effectively the time between the finalization of the SANREM CRSP Philippines Framework Plan and the initiation […]

  • Start Date: September 1993
  • End Date: April 1994
  • Project Code: P1-I
  • Lead University:

The 1993 Soil Management CRSP Project Evaluation Report

Prepared by the External Evaluation Panel in Preparation for the 1994-99 Extension Proposal.

  • Date of Publication: July 1993
  • Author(s): External Evaluation Panel
  • Type of Document: Project Document

CRSP:

Database:

Water Resource Management and Education in Watersheds of Bukidnon, Philippines

Coming soon

  • Start Date: February 1993
  • End Date: July 1997
  • Project Code: P10-I
  • Lead University:

Environmental Awareness Of, By, and For Empowerment of the Manupali Watershed Farming Families

The SANREM CRSP maintains that community participation is an irreplaceable avenue for appropriating long term changes in sustainable agriculture and natural resources management. To this end, […]

  • Start Date: January 1993
  • End Date: July 1997
  • Project Code: P14-I
  • Lead University:

Assembling the Elements for a Realistic Buffer Zone Resource Management Plan in the Philippines

Protected areas are in crisis throughout the developing world. Communities near protected ecosystems frequently bear substantial costs as a consequence of their proximity to these areas, […]

  • Start Date: January 1993
  • End Date: July 1997
  • Project Code: P15-I
  • Lead University:

Engaging the Whole: Operationalizing the Spread Effect at SANREM CRSP Sites

In addition to the administrative responsibilities of the Site Coordination Office (SCO), it serves the role of communications node for the host-country for the SANREM CRSP […]

  • Start Date: January 1993
  • End Date: August 1997
  • Project Code: P17-1
  • Lead University:

The Role of Soil Fertility Management on Growth, Yield, Nutrient Content and Pest Incidence in Hot Pepper (Capsicum chinense) and Callaloo (Amaranthus viridis) Cropping Systems

An experiment was conducted to compare three levels of soil applied fertilizer, foliar applied soluble fertilizer and a control, on Scotch Bonnet pepper (Capsicum chinense).

  • Start Date: 1993
  • End Date: 1998
  • Project Code: Not Available
  • Lead University:

Executive Summary Report: The Soil Management Collaborative Research Support Program 25 September 1992 through 24 September 1993

Contains an Overview of activities undertaken by the Soil Management CRSP between the years of 1992 and 1993.

  • Date of Publication: 1993
  • Author(s): Soil Management CRSP
  • Type of Document: Annual Report

CRSP:

Database: